I. Introduction

The CARES Act allocated $100 billion in relief funds to hospitals and other healthcare providers, to be distributed by the Department of Health and Human Services (“HHS”) through the Public Health and Social Services Emergency Relief Fund (or “Provider Relief Fund”). Many healthcare providers across the country have received payments from the Fund, beginning with an initial tranche of $30 billion distributed in mid-April, and many more will be receiving additional funding in coming weeks.

These funds provide critical support to hospitals, physician-owned practices, and other providers who face significant financial challenges caused by the dual shocks of preparing to treat COVID-19 patients while simultaneously losing revenue because of suspension of elective procedures. But the relief funds are subject to extensive terms and conditions, and with those conditions comes exposure to potential liability under the False Claims Act (“FCA”). This exposure is particularly acute given the broad and ambiguous language of some of the terms and conditions, the expectation of intensive government enforcement efforts following distribution of relief funds, and the economic incentives for private relators to commence FCA lawsuits.

Although many providers are understandably rushing to obtain relief funds immediately, it is critical to pay attention to the strings attached to those funds. Prudent providers can and should take steps now to mitigate the risk of potentially costly FCA claims that could arise later.

II. FCA Basics

The False Claims Act, enacted in 1863 to “stop[] the massive frauds perpetrated by large contractors during the Civil War,” Universal Health Servs., Inc. v. United States ex rel. Escobar, 136 S. Ct. 1989, 1996 (2016), imposes liability where a defendant “knowingly presents, or causes to be presented, a false or fraudulent claim for payment or approval” to the Government. 31 U.S.C. § 3729(a)(1). A person “knowingly” presents a false claim if he “(1) has actual knowledge of the information,” i.e., actually knows the claim is false; “(2) acts in deliberate ignorance of the truth or falsity of the information; or (3) acts in reckless disregard of the truth or falsity of the information.” 31 U.S.C. § 3729(b)(1); see United States v. Munoz-Escalante, 2015 U.S. Dist. LEXIS 142167, at * 6 (D.S.D. 2015) (citing United States ex rel. Quirk v. Madonna Towers, Inc., 278 F.3d 765, 767 (8th Cir. 2002)). Upon proving a violation, the Government can recover treble damages plus civil penalties. 31 U.S.C. § 3729(a)(1).

The Government itself may commence an FCA action, or a private relator may do so on behalf of the Government, in which case the Government may or may not choose to intervene in the case. In either case, damages recovered belong to the Government, but the relator is entitled to a share of the proceeds. See generally United States ex rel. Hunt v. Cochise Consultancy, Inc., 887 F.3d 1081, 187 (11th Cir. 2018).

Where, as here, the Government’s payment of funds is conditioned on compliance with certain requirements, FCA exposure can arise if the recipient of funds is alleged to have “falsely” certified compliance with the terms and conditions of payment. See, e.g., Escobar, 136 S. Ct. at 1995 (confirming the “implied false certification theory can be a basis for liability” under the FCA).

III. Terms & Conditions of Provider Relief Fund Payments

Providers who receive disbursements from the Provider Relief Fund are required to sign an attestation agreeing to the Government’s terms and conditions for receipt of the funds. In addition to a prohibition on using relief funds for expenses or losses reimbursed by other sources (i.e., no “double dipping”), and numerous other specific provisions, the terms and conditions prohibit “balance billing” out-of-network patients for “all care for a presumptive or actual case of COVID-19.”[1] The terms and conditions also impose a broad limitation on the purposes for which relief funds may be used:

The Recipient certifies that the Payment will only be used to prevent, prepare for, and respond to coronavirus, and that the Payment shall reimburse the Recipient only for health care related expenses or lost revenues that are attributable to coronavirus.

The latter two conditions in particular engender the potential for FCA litigation because they are both broadly applicable and ambiguous. For example, the prohibition on balance billing extends to “presumptive” cases of COVID-19, but fails to define a “presumptive” case. As experience with COVID-19 rapidly evolves, providers and public health agencies continually update clinical signs and symptoms of the disease, many of which are nonspecific. Virus test kits remain in short supply. Absent a test confirming a patient’s infection with the novel coronavirus, how is a provider to define “presumptive” cases of COVID-19 so as to comply with this condition? The Provider Relief Fund website states that “providers must agree not to seek collection of out-of-pocket payments from a COVID-19 patient that are greater than what the patient would have otherwise been required to pay if the care had been provided by an in-network provider” (emphasis added). This suggests that the out-of-pocket limitation applies only to COVID-19-related diagnosis and care, but ambiguity remains due to the lack of specific guidance.

The broad limitation on use of relief funds is similarly problematic. Given the devastating breadth of the COVID-19 pandemic’s medical, economic, and social effects, how are providers to distinguish “expenses or lost revenues” that are “attributable to the coronavirus” as opposed to some other cause? For example, do “health care related expenses . . . attributable to the coronavirus” include only the direct costs of purchasing additional personal protective equipment, ventilators, and other supplies necessary to treat COVID-19 patients? Or does this category include associated administrative costs, costs of training, etc.? Do “lost revenues . . . attributable to the coronavirus” include only revenues from elective procedures cancelled pursuant to government order or by medical necessity? Or could this category also include, for example, procedures that could have gone forward but were cancelled by patients because of perceived infection risk? Could it include loss of business opportunities that are shelved or cancelled because of the broader effects of the pandemic? The Government’s decision to distribute a portion of the funds immediately and broadly to all providers that received Medicare fee-for-service reimbursement in 2019 suggests that “attributable to the coronavirus” should include lost revenue caused by the economic downturn attributable to the coronavirus. But again, a lack of guidance on how directly lost revenue must be attributable to the coronavirus pandemic creates ambiguity.

So-called “subregulatory guidance,” that thicket of agency memoranda, website “FAQs,” and other directives not promulgated through notice-and-comment rulemaking or legislation, compounds the problems raised by ambiguous terms and conditions. Agencies are scrambling to issue new rules, directives, and direction as the COVID-19 pandemic evolves. This scramble is understandable, but it creates significant pressure for agencies to do something—fast—and that urgency does not lend itself to legislative action or the ordinary notice-and-comment rule-making process. From an administrative perspective, Department of Justice trial attorneys have been directed to not pursue FCA cases premised on violations of “sub-regulatory guidance”—this is the so-called “Brand Memo” of January 2018, which was later memorialized in section 1-20.000 of the Justice Manual. Likewise, the Courts have started to express some hostility to FCA cases premised on such violations, particularly in the wake of the June 2019 Supreme Court decision in Azar v. Allina Health Services, 139 S. Ct. 1804 (2019), which underscored the importance of notice-and-comment rulemaking to create substantive legal standards. Nevertheless, agencies will continue to promulgate subregulatory guidance, and it will continue to play a role in litigation, in one form or another.

IV. The Risks of Ambiguous Payment Conditions

As the foregoing examples suggest, there is room for interpretation and debate over the meaning of the broad language used in the terms and conditions attached to the Provider Relief Fund. And where there is room for debate, the potential for litigation increases considerably. This is particularly true where the Government is expected to ramp up enforcement efforts following disbursement of stimulus funds. Indeed, in announcing the allocation of additional funds, HHS Secretary Azar promised “significant anti-fraud and auditing work . . . by HHS, including the work of the Office of the Inspector General,” to enforce the conditions imposed on the disbursements. The Government’s efforts likely will focus on clear cases of willful fraud, rather than good-faith disputes over the meaning of ambiguous language in the terms and conditions. But recipients of relief funds cannot rely on good faith and prosecutorial discretion alone, because private relators still have significant financial incentives to pursue FCA claims. Ambiguous terms and conditions provide relators (and creative attorneys) a potential path to generate claims the Government probably would not pursue.

Fortunately for recipients of Provider Relief Fund payments, the federal courts generally hold that a defendant will not face FCA liability for violating a vague or ambiguous law, regulation, or contractual condition if the defendant’s interpretation of the condition was objectively reasonable. See, e.g., United States ex rel. Donegan v. Anesthesia Assocs. of Kansas City, 833 F.3d 874, 879 (8th Cir. 2016); United States ex rel. Purcell v. MWI Corp., 807 F.3d 281, 288 (D.C. Cir. 2015); United States v. Southland Mgmt. Corp., 326 F.3d 669, 684 (5th Cir. 2003) (en banc) (Jones, J., concurring) (“Where there are legitimate grounds for disagreement over the scope of a contractual or regulatory provision, and the claimant’s actions are in good faith, the claimant cannot be said to have knowingly presented a false claim.”). This principle, which functions as a particularized application of the knowledge or scienter requirement of an FCA claim, “helps to ensure that innocent mistakes made in the absence of binding interpretive guidance are not converted into FCA liability, thereby avoiding the potential due process problems posed by ‘penalizing a private party for violating a rule without first providing adequate notice of the substance of the rule.’” Purcell, 807 F.3d at 287 (quoting Satellite Broad. Co. v. Fed. Commc’ns Comm’n, 824 F.2d 1, 3 (D.C. Cir. 1987)).

There is an additional nuance, however: Even if a defendant received funds on the basis of an objectively reasonable interpretation of applicable conditions, the defendant still may be liable “if a Relator (or the United States) produces sufficient evidence of government guidance that ‘warned [the defendant] away from an otherwise reasonable interpretation’ of an ambiguous regulation.” Donegan, 833 F.3d at 879 (quoting Purcell, 807 F.3d at 290).

V. Mitigating FCA Risk Associated with Provider Relief Fund Payments

The foregoing case law should provide a viable defense for Provider Relief Fund recipients who use funds in accordance with good-faith, objectively reasonable interpretations of HHS’s terms and conditions. But providers should not simply hope to win the interpretive battle after an FCA claim is filed; there are steps providers can take now to bolster the likely strength of their defenses if litigation occurs.

First, recipients of Provider Relief Fund Payments should carefully monitor and track the uses of these funds, so they can demonstrate compliance with the terms and conditions. (Relatedly, note that the terms and conditions expressly require compliance with federal financial management and record retention regulations, including 45 C.F.R. §§ 75.302 and 75.361-365).

Second, recipients should carefully consider, articulate, and document how particular uses of relief funds meet the HHS conditions. Having supportable financial data to show that the recipient suffered an abnormal loss of revenue that can be attributable to coronavirus will likely be important to defend a recipient’s use of relief funds to support its operating expenses during the public health emergency. With respect to uses that may be debatable, providers should think critically and actively now about how those uses fit within the conditions, rather than waiting to generate a post hoc explanation after litigation arises. For example, in United States ex rel. Donegan v. Anesthesia Associates of Kansas City, the court ascribed some significance to the defendant’s reasonable definition of a vague regulatory term, adopted by the defendant’s Professional Practice Committee and documented in its Corporate Compliance Plan. 833 F.3d at 879.

Thoughtful and deliberate development of internal definitions and processes not only helps generate more defensible interpretive positions; it also should help to demonstrate that the recipient is acting thoughtfully and in good faith. While there is some disharmony in the case law regarding the legal significance of a recipient’s subjective good faith, see, e.g., John T. Boese & Douglas W. Baruch, Civil False Claims & Qui Tam Actions § 2.06 (4th ed.), a defendant’s good faith will almost always be relevant to the Government’s exercise of prosecutorial discretion, and to the judges and juries who ultimately decide cases.

Third, fund recipients should continue to monitor communications and guidance from HHS regarding the terms and conditions and use of funds. Even where agency guidance may not be legally binding, it often remains important as a practical matter and, even if not dispositive, it can play an evidentiary role in FCA litigation.

Fourth, recipients must be vigilant about understanding the nature and purpose of any deposits of Government funds. It is a mistake to take the view that “if HHS deposited the funds in our account, my organization was entitled to them.” The FCA’s reach is very broad—it is not just limited to affirmative requests for funds, but extends also to the knowing retention of overpayments and so-called “reverse” false claims. See 31 U.S.C. § 3729(a)(1)(G).

Finally, recipients should seek the advice of counsel regarding appropriate uses of Provider Relief Fund payments and other applicable conditions and regulatory requirements. Good, proactive legal advice can help mitigate the risk of facing FCA claims, and under certain circumstances can even provide a defense to an FCA claim if litigation occurs. See, e.g., United States ex rel. Bidani v. Lewis, 2001 U.S. Dist. LEXIS 260, at *24 (N.D. Ill. 2001) (citing United States v. Cheek, 3 F.3d 1057, 1061 (7th Cir. 1993)). It should be noted, however, that the advice-of-counsel defense may not be available to a defendant who “shops around” for a favorable legal opinion or otherwise does not act in good faith. See United States ex rel. Drakeford v. Tuomey Healthcare Sys., Inc., 792 F.3d 364, 380 (4th Cir. 2015).

VI. Conclusion

The Provider Relief Fund offers crucial support to hospitals, clinics, and other providers who face dire and immediate financial need. Providers in need of assistance certainly should avail themselves of this support as appropriate, but should be conscious of the attendant risks. Proactive, deliberate compliance actions are the best way to mitigate the risks of costly litigation likely to sweep through the healthcare industry on the heels of the COVID-19 pandemic.

 

[1] “[F]or all care for a presumptive or actual case of COVID-19, Recipient certifies that it will not seek to collect from the patient out-of-pocket expenses in an amount greater than what the patient would have otherwise been required to pay if the care had been provided by an in-network Recipient.”

 

Related Categories:

COVID-19,

Healthcare

Firm Highlights

Insights

SEC Proposes Expansion of Investment Adviser Performance-Based Compensation Rule

On September 30, 2026, the Securities and Exchange Commission (the “SEC”) proposed amendments to Rule 205-3 under the Investment Advisers Act of 1940, as amended (the “Advisers Act”), which provides an exemption from the general prohibition under Section 205(a)(1) of the Advisers Act on registered investment advisers receiving performance-based compensation (the “Proposal”) so long as performance-based compensation is limited to “qualified clients”.1 Most notably for private fund sponsors, the Proposal would expand the definition of “qualified client” to include any investors that satisfy the “accredited investor” definition under Regulation D. The Proposal may also have implications for private fund managers that rely on exemptions from investment adviser registration under state law because certain state-level investment adviser registration exemptions incorporate or otherwise reference the federal qualified client definition. Expansion of the Qualified Client Definition Under the current Rule 205-3, an investor generally may qualify as a qualified client if, among other alternatives, the investor has at least $1.4 million under management with the adviser or has a net worth exceeding $2.7 million. These thresholds are higher than the financial thresholds applicable to many accredited investors under Regulation D. As a result, an investor may currently qualify as an accredited investor for purposes of investing in a private offering without qualifying as a qualified client for purposes of paying performance-based compensation. The Proposal would expand the qualified client definition to include any natural person or legal entity investor that satisfies the accredited investor definition under Regulation D. The Proposal would also remove the assets under management and net worth thresholds under the current Rule 205-3 qualified client test. For private funds relying on Section 3(c)(1) of the Investment Company Act of 1940, this change could reduce the need to apply a separate qualified client standard to investors that already qualify as accredited investors. Dorsey Observations and Next Steps If adopted as proposed, the expanded qualified client definition could be particularly significant for private fund managers. Most private fund offerings are already limited to accredited investors under Regulation D. However, the Proposal could expand the pool of prospective investors available to emerging private fund managers while reducing the regulatory burden associated with complying with Rule 205-3. The Proposal could also benefit advisers operating below the SEC registration threshold that rely on a state private fund adviser exemption. A number of states have adopted exemptions modeled on the North American Securities Administrators Association (“NASAA”) private fund adviser exemption, which may condition relief for advisers to certain funds relying on Section 3(c)(1) on each beneficial owner satisfying the federal qualified client definition. However, state requirements vary, and any effect of the Proposal would depend on the text of the applicable state exemption and how it incorporates Rule 205-3. Many emerging private fund managers may have a larger network of accredited investor relationships than qualified client relationships during the early stages of their investment advisory business. Currently, under Rule 205-3, private fund managers may receive performance-based compensation from investors who do not satisfy the qualified client definition if those investors were admitted to their private funds prior to registration with the SEC. Following registration with the SEC, however, managers may continue to permit investors that are not qualified clients to invest in future private funds but may not receive performance-based compensation from those investors with respect to such investments. In addition, because the net worth and assets under management thresholds for qualified client status are adjusted for inflation every five years, the pool of qualified client investors may diminish over time as previously eligible investors no longer satisfy the applicable thresholds. The Proposal could provide the dual benefit of greater flexibility for private fund managers to establish and maintain relationships with accredited investors as their businesses scale and they become registered with the SEC, and greater flexibility for certain accredited investors to participate in investment strategies that historically have been restricted to much larger institutional investors. Unless and until the Proposal is adopted, investment advisers should continue to comply with the existing qualified client requirements. If the Proposal is adopted, private fund sponsors should consider whether corresponding changes are appropriate for their subscription documents, investor questionnaires, and other offering materials. Advisers that are state-registered or rely on a state-level exemption should also consult the laws and regulations of each relevant jurisdiction before changing investor eligibility standards or performance-based compensation practices, because adoption of the federal amendments may not automatically modify state requirements. Comments on the Proposal will be due 60 days after publication in the Federal Register. 1 Investment Adviser Performance-Based Compensation Modernization, Investment Advisers Act Release No. IA-7022 (Sept. 30, 2026), available at https://www.sec.gov/rules-regulations/2026/09/s7-2026-28#33-11443proposed.

Insights

Energy Law: Month in Review - September 2026

Welcome to Dorsey’s Energy Law: Month in Review. We provide this update to our clients to identify significant developments in the previous month. Please reach out to any of the authors, listed above, to discuss these issues. Regulatory Developments Massachusetts Ratchets Up State and Local Regulation of AI Data Centers In early September, Governor Maura Healey of Massachusetts signed an executive order requiring that artificial intelligence data centers secure the approval of local communities as a precondition to proceeding with a given project. According to the terms of the order, data center developers will need to secure a “community benefits agreement” as a precondition to receiving permits from numerous state agencies, including the Department of Environmental Protection, the Energy Facilities Siting Board, and the Massachusetts Environmental Policy Act Office. Beyond requiring community benefits agreements, the order also mandates that developers mitigate utility costs to consumers, prohibits the use of nondisclosure agreements, and requires various state agencies to develop measures to limit data center impacts on the environment. North Carolina Regulators Decline Approval of Duke Energy Gas Turbine On September 18, 2026, North Carolina Utilities Commission (NCUC) denied Duke Energy’s application for a certificate of public convenience and necessity required to construct a gas-fueled combustion turbine at its Smith Energy Complex in North Carolina. The NCUC objected strongly to the $584 million price tag and noted that Duke appeared to be constructing the facility “based on anticipated data center customer additions.” The NCUC rejected that anticipated growth as “insufficiently reliable for the Commission to act at this point.” In rejecting Duke’s application, the NCUC also noted that Duke had signed the White House Ratepayer Protection Pledge, in which it represented that it would not shift data center costs to consumers. The NCUC observed that the record did not demonstrate how Duke “intends to adhere to its commitments under the Ratepayer Protection Pledge with regard to the Proposed Facility.” Notably, commission staff had actually supported the construction of the turbine, citing concerns about Duke’s reserve margins. The NCUC noted that it “understands the Public Staff’s expressed concerns,” but those concerns were outweighed by the NCUC’s reservations, including questions of demand. Department of Energy Approves Funds for Grid Improvement The U.S. Department of Energy (DOE) recently announced that it would fund 31 grid-improvement projects in 26 states. The funding initiative is part of the DOE’s “SPARK” initiative. The funding will include $1.9 billion in federal funding from DOE and $3.35 billion in recipient cost-sharing funding. The funds will go to projects designed to improve grid reliability and lower electricity costs. Recipients plan to reconductor over 1,500 miles of transmission lines and will deploy grid-enhancing technologies across approximately 21,000 miles. DOE stated that this initiative will make available over 23 additional gigawatts of electricity. Texas Moderates Rules Governing Data Center Interconnection The Texas Public Utility Commission adopted new regulations governing large-load interconnections. The rules impose a flat study fee of $100,000 for all proposed interconnections, which departs from the initial proposal to impose study fees using a tiered system based on project size. Additionally, the final rule eliminates the PUC’s previous proposal to impose a non-refundable interconnection fee of $50,000 per MW of contracted peak demand. The final rule also moderates the initially proposed regulations governing Electric Reliability Council of Texas (ERCOT) notifications for large-load customers’ non-utilized capacity. The proposed rules would have required notifying ERCOT within 30 days of missing a scheduled energization milestone by six months. The final rules, however, do not require informing ERCOT unless a scheduled energization milestone is missed by 24 months. FERC Denies TransAlta 202(c) Cost-Recovery Plan The Federal Energy Regulatory Commission (FERC) recently rejected TransAlta’s plan to recover $19.9 million in expenses stemming from a DOE order in which DOE prohibited TransAlta from retiring its coal-powered Centralia power plant. TransAlta had previously intended to retire the facility at the end of 2025. TransAlta’s cost recovery plan proposed spending an additional $23 million on repairs to continue operating the unit. FERC’s main objection had to do with geographic scope. TransAlta’s recovery plan called for recovering costs from California Independent System Operator (CAISO) and the Southwest Power Pool (SPP), but the DOE’s order requiring operation of the plant was designed to ensure reliability in the Northwest assessment area (Montana, Oregon, Washington, and parts of northern California and northern Idaho). Accordingly, FERC was unwilling to allow cost recovery from CAISO and SPP when the order that precipitated the additional costs only related to the Northwest assessment area. FERC informed TransAlta that it would only approve cost recovery from load-serving entities in the Northwest assessment area. FERC’s decision comes amid a rush of DOE emergency orders requiring the continued operation of coal-fired generating units. Litigation Appeals Court Upholds Washington Hydropower Plant With Caveats In a September 21, 2026, opinion, the Washington Court of Appeals largely upheld a Clean Water Act water quality certification by the Washington Department of Ecology for the Goldendale Energy Storage Project, a proposed pumped-water storage hydropower system adjacent to, but off-stream from, the Columbia River. A nonprofit (Columbia Riverkeeper) and the Confederated Tribes and Bands of the Yakama Nation appealed the certification, contending that it failed to impose necessary conditions and monitoring requirements to protect the water quality of the Columbia River. Most saliently, the plaintiffs argued that the project had the potential to leak 100 acre-feet of water per year into tributaries of the Columbia River. The Court of Appeals broadly rejected plaintiffs’ challenge to the state’s conclusion that “the project was designed not to leak.” That said, the Court of Appeals did reverse on one narrow issue. Specifically, the court determined that the state’s conclusion that “leakage from the project’s tunnels would be monitored and reported” was not supported by the evidence because the certification “does not explicitly require monitoring and reporting to determine whether there is any leakage.” Accordingly, the court remanded the matter to the state to impose monitoring and reporting requirements but otherwise affirmed the certification. Legislative Developments California Legislates Restrictions on Data Center Energy Use and Grid Costs On September 21, 2026, California Governor Gavin Newsom signed seven bills broadly regulating data centers in the state. SB 1168 directed the California Public Utilities Commission to assess the energy used by data centers. It also requires the PUC to pass costs of transmission and distribution upgrades and load increases on to data centers, rather than customers. SB 886 and SB 887 compel data centers to pay for infrastructure upgrade and generation costs, and wildfire mitigation costs, in addition to imposing environmental review. The statutes additionally increase local oversight of data centers. AB 1577 imposes a monthly reporting requirement that requires data centers to supply energy consumption and efficiency data to the California Energy Commission. AB 2383 contains incentives for data centers to use onsite clean energy generation. Finally, AB 2469 and AB 2619 require data center developments to assess water supply and develop a water scarcity plan. The statutes also mandate statewide water reporting as a precondition to obtaining and renewing business licenses.

News

Dorsey & Whitney Partner Michael W. Droke Releases Fourth Edition of Cooperative Business Law: A Practical Guide with Enhanced Insights for Today's Cooperatives

Industry-leading reference updated with practical tips and current cooperative law developments Dorsey & Whitney LLP is pleased to announce the publication of the fourth edition of Cooperative Business Law: A Practical Guide to the Special Laws Governing Cooperatives, authored by Dorsey Partner Michael W. Droke. Drawing on more than 20 years of direct experience as outside general counsel to major agricultural and food industry cooperatives, Droke has updated this essential resource with new practical tips, real-world guidance, and insights into emerging cooperative law issues that matter to cooperative leaders and their advisors. Since its initial publication, this comprehensive guide has become the standard reference for attorneys, executives, and cooperative governance professionals navigating the unique legal landscape of cooperative organizations. The new fourth edition builds on that foundation by incorporating practical lessons learned from recent cooperative transactions, governance challenges, and regulatory developments. "I am grateful for Dorsey's continued support of this work and for the opportunity to contribute to the cooperative community," said Droke. "Over the past 20 years, I've had the privilege of serving as outside general counsel to some of the nation's most successful cooperatives. The practical insights gained from that work inform every page of this edition. I wanted to create a resource that helps cooperative leaders and their legal advisors tackle real business challenges with confidence." The Fourth Edition features: Practical tips and real-world case examples drawn from decades of cooperative practice Guidance on cooperative formation, governance, member rights, and voting structures Current analysis of antitrust and Capper-Volstead Act issues affecting modern cooperatives Insights into financing, mergers and acquisitions, and corporate restructuring for cooperatives Member relations strategies and dispute resolution approaches specific to cooperative structures About Michael W. Droke Michael W. Droke is a Partner at Dorsey & Whitney LLP and Firmwide Co-Chair of the Food, Beverage & Agriculture practice group. He serves as outside primary counsel for numerous cooperatives, providing comprehensive legal guidance on all aspects of cooperative operations, governance, member relations, corporate restructuring, financing, and mergers and acquisitions. His representative clients include National Co+op Grocers, Darigold, the Northwest Dairy Association, Organic Family Farms Cooperative, Chelan Fruit Cooperative, and Sacramento Natural Foods Co-op. A former business executive who brings a dual perspective to his practice, Droke combines legal expertise with practical business acumen. He has served as an outside board member and general counsel for major cooperatives and maintains deep involvement in the cooperative community through regular presentations and participation in industry organizations including NCBA CLUSA, the National Society of Accountants for Cooperatives, and the National Council of Farmer Cooperatives. About Dorsey & Whitney's Cooperative Law Practice Dorsey & Whitney's Cooperative Law practice group is a recognized national leader in cooperative law with more than 45 years of experience serving agricultural cooperatives, rural electric cooperatives, purchasing cooperatives, consumer cooperatives, worker cooperatives, and cooperative start-ups across the nation. The practice includes 20 dedicated lawyers who advise cooperatives and other agriculture-related organizations on formation and organization, voting rights and governance, antitrust and Capper-Volstead Act compliance, tax issues, project development and finance, mergers and acquisitions, real estate, labor and employment, environmental compliance, and all other aspects of cooperative business operations. Cooperative Business Law: A Practical Guide to the Special Laws Governing Cooperatives, Fourth Edition, is available from major book retailers and online booksellers.

Insights

EPA Limits Title V Re-Litigation of NSR Permits

Overview On September 25, 2026, the U.S. Environmental Protection Agency (“EPA”) published a final rule that significantly limits the ability of third parties to use the Clean Air Act (“CAA”) Title V permitting process to revisit New Source Review (“NSR”) permitting decisions years after those decisions were made. The rule establishes that NSR permitting determinations generally must be challenged during the original permitting proceeding, thereby providing regulated sources with greater permitting certainty and finality for major capital projects. Published in the Federal Register titled Clarifying the Scope of “Applicable Requirements” Under State Operating Permit Programs and the Federal Operating Permit Program (Docket ID No. EPA-HQ-OAR-2023-0401), the rule amends 40 C.F.R. Parts 70 and 71 to codify EPA’s interpretation regarding when requirements established under other CAA programs may be reviewed, modified, or implemented through the Title V operating permit program. The rule becomes effective 30 days after publication. The rule addresses two principal issues: (1) the relationship between NSR preconstruction permitting and Title V operating permits, and (2) the treatment of the General Duty Clause under CAA section 112(r)(1). Most significantly, the rule provides greater certainty for sources navigating the NSR permitting process. EPA’s amendments are intended to ensure that NSR permitting decisions made through an approved public process are generally not revisited later through Title V permit proceedings. The rule responds to a circuit split between the U.S. Courts of Appeals for the Fifth and Tenth Circuits. In Environmental Integrity Project v. EPA, 969 F.3d 529 (5th Cir. 2020), the Fifth Circuit upheld EPA’s interpretation, concluding that it was consistent with the text, structure, and purpose of Title V. In contrast, the Tenth Circuit reached the opposite conclusion in Sierra Club v. EPA, 964 F.3d 882 (10th Cir. 2020), finding that the then-existing regulatory definition of “applicable requirement” did not support EPA’s position. By amending the regulatory language on which the Tenth Circuit relied and codifying the interpretation approved by the Fifth Circuit, EPA has established a nationwide framework governing the interaction between NSR and Title V. NSR and Title V: EPA Establishes a Uniform Nationwide Framework At the core of the rule is EPA’s effort to define the respective roles of NSR and Title V. The rule codifies the approach EPA has applied since 2017: once a source obtains an NSR permit under an EPA-approved permitting program, and that permit was issued following public notice with an opportunity for comment and judicial review, the permit establishes the NSR-related “applicable requirements” of the State Implementation Plan (“SIP”) or Federal Implementation Plan (“FIP”) for Title V purposes. Under this framework, Title V is not a vehicle for re-examining underlying NSR permitting decisions. EPA does not intend to use the Title V process to revisit applicability determinations, emissions calculations, control technology determinations, permit conditions, or other issues resolved through the NSR permitting process. This principle applies regardless of the stage of the Title V proceeding; whether the NSR permit was issued pursuant to a SIP or FIP; the type of NSR issue involved; or whether the NSR permit is incorporated into Title V sequentially or concurrently. Limited Exceptions EPA recognizes several circumstances in which NSR issues may still be reviewed through the Title V program: No NSR permit was issued at all; The permit was issued without public notice and an opportunity for comment and judicial review; or The issue involves substantive overlap between Title V and NSR requirements, such as the adequacy of monitoring provisions. As a result, the rule does not insulate unpermitted projects or foreclose review of matters that independently arise under Title V. Key Regulatory Amendments The rule revises the definition of “applicable requirement” in 40 C.F.R. §§ 70.2 and 71.2. Paragraph (1): Where an NSR permit is issued with public notice and an opportunity for comment and judicial review, the permit establishes and defines the applicable SIP or FIP requirements for Title V purposes. Paragraph (2): All NSR permit terms, including terms contained in minor NSR permits, constitute applicable requirements that must be incorporated into Title V permits. Paragraph (4): CAA section 112(r)(1) (the General Duty Clause) is expressly excluded from the definition of “applicable requirement,” while section 112(r)(7) Risk Management Program requirements remain included. EPA also amended 40 C.F.R. §§ 70.8 and 70.12 to clarify that alleged defects in requirements established outside the Title V process generally do not provide a basis for EPA objection to a Title V permit or for a Title V citizen petition. General Duty Clause Exclusion The rule also codifies EPA’s longstanding position that the General Duty Clause in CAA section 112(r)(1) is not an “applicable requirement” for Title V purposes. EPA points to several considerations supporting that conclusion, including the distinction between the General Duty Clause and Title V permit terms, the provision’s origins in the Occupational Safety and Health Act’s general duty clause, and the different enforcement structures applicable to the General Duty Clause and Title V permit requirements. Importantly, excluding section 112(r)(1) from the definition of “applicable requirement” does not eliminate EPA’s authority to enforce the General Duty Clause independently of the Title V program. The final rule instead clarifies that the General Duty Clause need not—and should not—be incorporated into Title V permits as an applicable requirement. Practical Implications for Regulated Sources Greater Finality for NSR Permits  For projects requiring PSD, nonattainment NSR, or minor NSR permits, the permitting process becomes the primary forum for resolving disputes regarding applicability determinations, emissions calculations, control technology requirements, offsets, and permit conditions. Once an NSR permit is issued through a qualifying public process, regulated sources should face substantially reduced risk that those same issues will be challenged years later through Title V permit proceedings. Reduced Risk of Collateral Permit Challenges Stakeholders have sometimes sought to use Title V permit issuance, renewal, revision, or citizen-petition proceedings to challenge underlying NSR determinations. The final rule makes clear that Title V is not the appropriate vehicle for challenging whether an applicable requirement was correctly established in the first instance. This should reduce the risk of permit delays and uncertainty associated with collateral challenges to previously issued NSR permits. The rule does not, however, eliminate all Title V challenges relating to an NSR permit. Challenges concerning the Title V permit itself—including whether it appropriately incorporates applicable requirements or contains adequate compliance provisions—remain possible. Increased Importance of the Initial NSR Proceeding Because Title V generally will not provide a second opportunity to challenge the substantive validity of an NSR determination, the administrative record developed during the NSR process becomes increasingly important. Permit applicants should ensure that applicability analyses, emissions calculations, control technology evaluations, modeling demonstrations, and supporting technical documentation are thoroughly developed during the original permitting proceeding. For significant projects, applicants may therefore have an additional incentive to identify and resolve potential permitting issues before the NSR permit is issued rather than assuming that unresolved issues can be addressed during a subsequent Title V proceeding. Potential Incentive for Broader Public Participation EPA also notes that permitting authorities may choose to provide public notice and an opportunity for comment for a broader range of NSR permits because permits issued through a qualifying public process receive the benefit of the finality framework established by the rule. Some permitting authorities may conclude that greater public participation at the NSR stage is preferable to uncertainty during subsequent Title V proceedings. Conclusion The final rule is principally a permitting-certainty measure. For sources that obtain NSR permits through a public process, EPA has substantially limited the ability of third parties to revisit underlying NSR determinations through the Title V program. As a result, regulated entities should benefit from greater finality regarding key permitting decisions, reduced risk of collateral permit challenges, and increased certainty when planning and implementing capital projects.

Insights

The Supreme Court Update - October 8, 2026

On September 29, 2026, the Supreme Court granted certiorari in one case: Department of Homeland Security v. D.V.D., No. 26-426: This case concerns the Trump Administration’s “third-country removal” procedures, where immigrants are deported to countries not listed in the removal orders. In granting certiorari, the Court granted the Government’s application to stay a lower court decision halting the practice, which will allow third-country removals to continue pending resolution of the case. The issues presented are: (1) Whether the district court had jurisdiction over respondents’ claims; (2) whether the district court had authority to enter class-wide declaratory relief and APA vacatur under 8 U.S.C. § 1252(f)(1); (3) whether the Government’s guidance on third-country removals is unlawful under 8 U.S.C. § 1231(b), the due process clause, or FARRA/CAT and its implementing regulations; and (4) such other questions that the Government determines are appropriate for the proper disposition of the case. On October 1, 2026, the Court granted certiorari in three additional cases: Rhoney v. Barbosa da Cunha, No. 26-104: Immigration officials detained Ricardo Aparecido Barbosa da Cunha—a Brazilian citizen who had lived in the United States for approximately twenty years after entering without inspection—and denied him a bond hearing under 8 U.S.C. § 1225(b)(2)(A). The Second Circuit held that his detention was instead governed by § 1226(a), which permits release on bond, because § 1225(b)(2)(A)’s mandatory-detention requirement applies only to noncitizens apprehended while entering the country or shortly thereafter. The question presented is: Whether 8 U.S.C. § 1225(b)(2)(A) mandates the detention pending removal proceedings of aliens who, like Barbosa da Cunha, are present in the United States without having been admitted. Missionaries of St. John the Baptist, Inc. v. Frederic, No. 25-113: A Catholic religious organization sought to build a shrine to the Virgin Mary on land the organization owned adjacent to its church in Park Hills, Kentucky. Local zoning restrictions prohibited the proposed construction. The question presented is: Whether a land-use regulation that prohibits a religious institution from building a religious structure on its own property constitutes a “substantial burden” on religious exercise under the Substantial Burden Provision of the Religious Land Use and Institutionalized Persons Act, 42 U.S.C. § 2000cc(a). Marschner v. Marschner, No. 25-1349: Under the Uniformed Services Former Spouses’ Protection Act (“USFSPA”), a veteran’s longevity-based retirement pay can be divided in a divorce, but retirement pay based on disability and retirement pay that was waived to receive disability pay are indivisible. The question presented is: Does the USFSPA require state courts to refuse enforcement of indemnification provisions in a divorce settlement agreement?